DemoInvented notices from invented issuers, dated from today. Everything else works as it does for a subscriber.

Create account

EXAMPLE EMAIL

The digest in your inbox

This is the email a subscriber receives, built by the same code from the notices on the demo board. Each item has two links: the issuer’s own notice, and the card where you say whether you are interested.

Hide a notice on the board and it leaves this email for good. Pin the dredged material pilot, which has an addendum, and it arrives as an update to a saved notice.

From
RestorationRFP
To
estimating@example.com
Subject
RestorationRFP daily digest, Nov 22, 2026: 8 new matches
Plain-text version of the same email
RestorationRFP daily digest for Sample Restoration Design Co., Nov 22, 2026

New matches (8)
===============

DESIGN | Bioretention and Stormwater Pond Retrofits at Two Elementary Schools: Design
  Issuer: Marlow County Public Schools · Ashby Mills, MD
  📅 Due: Nov 25, 2026, 11:00 AM EST
  Engineering design to convert two dry ponds to wet ponds with forebays and add six bioretention cells treating about nine acres of roof and parking lot at two school campuses.
  Why: Location: Maryland; Specialty: Stormwater and green infrastructure; Work type: Design; Stage: Design, Engineering
  Issuer notice → https://restorationrfp.com/demo/notices/marlow-schools-bioretention-retrofits
  Interested or not → https://restorationrfp.com/demo/opportunities/d0000000-0000-4000-8000-000000000003

WORK TYPE NOT STATED | Wetland Mitigation Site Monitoring Services, Five-Year Term
  Issuer: Kingsmere Soil and Water Conservation District · Kingsmere, VA
  📅 Due: Dec 2, 2026, 4:00 PM EST
  Annual vegetation, hydrology and soils monitoring at four wetland mitigation sites totaling 86 acres, with reports to the regulatory agencies and recommendations for corrective action.
  Why: Location: Virginia; Specialty: Wetlands and marshes; Work type not stated; Stage: Monitoring
  Issuer notice → https://restorationrfp.com/demo/notices/kingsmere-swcd-wetland-mitigation-monitoring
  Interested or not → https://restorationrfp.com/demo/opportunities/d0000000-0000-4000-8000-000000000004

DESIGN-BUILD | Cove Park Living Shoreline: Design-Build
  Issuer: Town of Wexley Harbor · Wexley Harbor, MD
  📅 Due: Dec 6, 2026, 3:00 PM EST
  Design-build of roughly 620 feet of living shoreline at Cove Park: stone sills, sand fill and marsh plantings replacing a failing timber bulkhead, with permits and three years of monitoring.
  Why: Location: Maryland; Specialty: Shorelines and living shorelines, Wetlands and marshes; Work type: Design-build; Stage: Design, Monitoring, Permitting
  Pre-bid: Friday, November 27 at 9:00 AM Eastern, Cove Park pavilion, 14 Wharf Lane (site walk) (mandatory)
  Issuer notice → https://restorationrfp.com/demo/notices/wexley-harbor-cove-park-living-shoreline
  Interested or not → https://restorationrfp.com/demo/opportunities/d0000000-0000-4000-8000-000000000002

DESIGN | Heron Creek Tidal Marsh Restoration Feasibility Study
  Issuer: Heron Creek Conservancy · Port Lindley, DE
  📅 Due: Dec 9, 2026, 5:00 PM EST
  Feasibility study for restoring tidal exchange to 140 acres of impounded marsh on Heron Creek: hydrodynamic modeling, three restoration alternatives and planning-level costs.
  Why: Location: Delaware; Specialty: Wetlands and marshes; Work type: Design; Stage: Feasibility study, Planning
  Issuer notice → https://restorationrfp.com/demo/notices/heron-creek-conservancy-marsh-feasibility
  Interested or not → https://restorationrfp.com/demo/opportunities/d0000000-0000-4000-8000-000000000006

DESIGN | Bear Branch Stream Restoration, Phase 2: Design and Permitting
  Issuer: Marlow County Department of Public Works · Ashby Mills, MD
  📅 Due: Dec 13, 2026, 2:00 PM EST
  Design and permitting for about 3,400 linear feet of degraded stream channel on Bear Branch, including a geomorphic assessment, 30, 60 and 90 percent plans and joint permit applications.
  Why: Location: Maryland; Specialty: Stream restoration; Work type: Design; Stage: Design, Engineering, Permitting
  Pre-bid: Saturday, November 28 at 10:00 AM Eastern, County Office Building, Room 210, and by video (optional)
  Issuer notice → https://restorationrfp.com/demo/notices/marlow-county-bear-branch-stream-restoration
  Interested or not → https://restorationrfp.com/demo/opportunities/d0000000-0000-4000-8000-000000000001

DESIGN | Beneficial Use of Dredged Material: Thin-Layer Placement Pilot Design
  Issuer: Mid-Atlantic Port Commission · Garrison Island, MD
  📅 Due: Dec 16, 2026, 1:00 PM EST
  Design of a pilot that places a thin layer of maintenance-dredged sediment on 35 acres of subsiding marsh at Garrison Island, with a monitoring plan and permit applications.
  Why: Location: Maryland; Specialty: Beneficial reuse of dredged material (incl. thin-layer placement), Wetlands and marshes; Work type: Design; Stage: Design, Monitoring, Permitting
  Issuer notice → https://restorationrfp.com/demo/notices/mid-atlantic-port-commission-thin-layer-placement
  Interested or not → https://restorationrfp.com/demo/opportunities/d0000000-0000-4000-8000-000000000007

DESIGN | Mill Street Corridor Green Stormwater Infrastructure: Engineering Design
  Issuer: City of Easton Falls · Easton Falls, PA
  📅 Due: Dec 20, 2026, 2:00 PM EST
  Engineering design of curb bump-outs, tree trenches and permeable parking lanes along eleven blocks of Mill Street to reduce combined sewer overflows, coordinated with a planned repaving.
  Why: Location: Pennsylvania; Specialty: Stormwater and green infrastructure; Work type: Design; Stage: Design, Engineering, Planning
  Pre-bid: Tuesday, December 1 at 1:00 PM Eastern, City Hall, Council Chambers (optional)
  Issuer notice → https://restorationrfp.com/demo/notices/easton-falls-mill-street-green-infrastructure
  Interested or not → https://restorationrfp.com/demo/opportunities/d0000000-0000-4000-8000-000000000005

DESIGN | On-Call Stream and Outfall Stabilization Design Services
  Issuer: Three Forks Regional Stormwater Authority · Alder Hollow, VA
  📅 Due: Dec 27, 2026, 2:00 PM EST
  Three-year on-call contract for design of stream restoration and outfall stabilization projects, issued as task orders of $40,000 to $350,000 each.
  Why: Location: Virginia; Specialty: Stormwater and green infrastructure, Stream restoration; Work type: Design; Stage: Design, Engineering, Permitting
  Issuer notice → https://restorationrfp.com/demo/notices/three-forks-authority-on-call-stream-outfall-design
  Interested or not → https://restorationrfp.com/demo/opportunities/d0000000-0000-4000-8000-000000000008

Opening a link never changes anything; choose "Interested or not" to record a decision.
Expired RFPs: https://restorationrfp.com/demo/opportunities/archive
Preferences: https://restorationrfp.com/demo/digest?link=preferences
Unsubscribe this address: https://restorationrfp.com/demo/digest?link=unsubscribe
Email preferences and marketing unsubscribe: https://restorationrfp.com/demo/digest?link=email-preferences

RestorationRFP, LLC · 4709 Harford Rd STE 44834, Baltimore, MD 21214