DemoInvented notices from invented issuers, dated from today. Everything else works as it does for a subscriber.

Create account

OPPORTUNITY BOARD

Matches for Sample Restoration Design Co.

New matches first. Interested pins a notice below them, sorted by deadline. Not interested hides it and keeps it out of future emails, reposts included. Either can be undone.

The sample firm’s profile: beneficial reuse of dredged material (incl. thin-layer placement); shorelines and living shorelines; stormwater and green infrastructure; stream restoration; wetlands and marshes. Design and design-build work in Delaware, Maryland, Pennsylvania, Virginia. Your own profile decides what reaches your board.

See the email these notices arrive in

New matches (8)

Open notices that fit the profile

  • Marlow County Public Schools · Design

    Bioretention and Stormwater Pond Retrofits at Two Elementary Schools: Design

    Due Nov 25, 2026, 11:00 AM EST · Ashby Mills, MD

    Engineering design to convert two dry ponds to wet ponds with forebays and add six bioretention cells treating about nine acres of roof and parking lot at two school campuses.

    • Location: Maryland
    • Specialty: Stormwater and green infrastructure
    • Work type: Design
    • Stage: Design, Engineering
    Issuer notice
  • Kingsmere Soil and Water Conservation District · Work type not stated

    Wetland Mitigation Site Monitoring Services, Five-Year Term

    Due Dec 2, 2026, 4:00 PM EST · Kingsmere, VA

    Annual vegetation, hydrology and soils monitoring at four wetland mitigation sites totaling 86 acres, with reports to the regulatory agencies and recommendations for corrective action.

    • Location: Virginia
    • Specialty: Wetlands and marshes
    • Work type not stated
    • Stage: Monitoring
    Issuer notice
  • Town of Wexley Harbor · Design-build

    Cove Park Living Shoreline: Design-Build

    Due Dec 6, 2026, 3:00 PM EST · Wexley Harbor, MD

    Design-build of roughly 620 feet of living shoreline at Cove Park: stone sills, sand fill and marsh plantings replacing a failing timber bulkhead, with permits and three years of monitoring.

    • Location: Maryland
    • Specialty: Shorelines and living shorelines, Wetlands and marshes
    • Work type: Design-build
    • Stage: Design, Monitoring, Permitting
    Issuer notice
  • Heron Creek Conservancy · Design

    Heron Creek Tidal Marsh Restoration Feasibility Study

    Due Dec 9, 2026, 5:00 PM EST · Port Lindley, DE

    Feasibility study for restoring tidal exchange to 140 acres of impounded marsh on Heron Creek: hydrodynamic modeling, three restoration alternatives and planning-level costs.

    • Location: Delaware
    • Specialty: Wetlands and marshes
    • Work type: Design
    • Stage: Feasibility study, Planning
    Issuer notice
  • Marlow County Department of Public Works · Design

    Bear Branch Stream Restoration, Phase 2: Design and Permitting

    Due Dec 13, 2026, 2:00 PM EST · Ashby Mills, MD

    Design and permitting for about 3,400 linear feet of degraded stream channel on Bear Branch, including a geomorphic assessment, 30, 60 and 90 percent plans and joint permit applications.

    • Location: Maryland
    • Specialty: Stream restoration
    • Work type: Design
    • Stage: Design, Engineering, Permitting
    Issuer notice
  • Mid-Atlantic Port Commission · Design

    Beneficial Use of Dredged Material: Thin-Layer Placement Pilot Design

    Due Dec 16, 2026, 1:00 PM EST · Garrison Island, MD

    Design of a pilot that places a thin layer of maintenance-dredged sediment on 35 acres of subsiding marsh at Garrison Island, with a monitoring plan and permit applications.

    • Location: Maryland
    • Specialty: Beneficial reuse of dredged material (incl. thin-layer placement), Wetlands and marshes
    • Work type: Design
    • Stage: Design, Monitoring, Permitting
    Issuer notice
  • City of Easton Falls · Design

    Mill Street Corridor Green Stormwater Infrastructure: Engineering Design

    Due Dec 20, 2026, 2:00 PM EST · Easton Falls, PA

    Engineering design of curb bump-outs, tree trenches and permeable parking lanes along eleven blocks of Mill Street to reduce combined sewer overflows, coordinated with a planned repaving.

    • Location: Pennsylvania
    • Specialty: Stormwater and green infrastructure
    • Work type: Design
    • Stage: Design, Engineering, Planning
    Issuer notice
  • Three Forks Regional Stormwater Authority · Design

    On-Call Stream and Outfall Stabilization Design Services

    Due Dec 27, 2026, 2:00 PM EST · Alder Hollow, VA

    Three-year on-call contract for design of stream restoration and outfall stabilization projects, issued as task orders of $40,000 to $350,000 each.

    • Location: Virginia
    • Specialty: Stormwater and green infrastructure, Stream restoration
    • Work type: Design
    • Stage: Design, Engineering, Permitting
    Issuer notice

Pinned (0)

Soonest deadline first; open a row for the full card

Nothing pinned yet. Mark a match as interested to keep it here.

Hidden (0)

Not interested; undo any time

Nothing hidden.

Archive: expired RFPs